Welcome back to Transmission Week here at Volts!
In my previous post, I explained why the US needs lots of new high-voltage power lines. They will help stitch together America’s balkanized grids, connect remote renewable energy to urban load centers, prepare the country for the coming wave of electrification, and relieve grid congestion. And oh yeah — we won’t be able to decarbonize the country without them.
Nonetheless, they are not getting built! It’s a problem.
Today, we’re going to walk step by step through the process and show why they’re not getting built. At each stage, we’ll look at what Congress can do — and what Biden can do without Congress’ help — to get the process moving. This is some wonky stuff, but I’ve tried to keep it as simple as possible.
Before we start …
Transmission-related acronyms
This post will involve numerous acronyms, so to make things easier, I’ve put together a little acronym guide here at the beginning for you to check as needed. If you’re already an electricity system wonk, you can skip this.
* DOE: The Department of Energy. The federal agency responsible for, among many other things, energy research.
* FERC: The Federal Energy Regulatory Commission. The federal agency that regulates interstate transmission of, and bulk sale of, electricity and natural gas.
* IOU: Investor-owned utility. Privately owned companies acting as public utilities. Excepting some federally owned and municipal utilities, most utilities in the US are IOUs.
* ISO: Independent System Operator. For our purposes here, you can think of these as the same as RTOs (see below). This is why you constantly hear people in this field using the unwieldy phrase “RTOs and ISOs.”
* NIETC: A National Interest Electric Transmission Corridor, designated by DOE as an area in particular need of new transmission to ease costs or congestion.
* NREL: The National Renewable Energy Laboratory, a DOE-run research lab.
* PMA: Power Marketing Administration. Federal agencies that operate electric systems and sell the electrical output of federally owned hydroelectric dams in 33 states. They are: Bonneville Power Administration (BPA), Western Area Power Administration (WAPA), Southeastern Power Administration (SEPA), and Southwestern Power Administration (SWPA).
* RTO: Regional Transmission Organization. Non-governmental organizations (which nonetheless have government-like powers) that oversee transmission planning and wholesale energy markets in areas of the country that have been “restructured,” i.e., where generation, transmission, and distribution are owned by separate utilities. RTO membership is composed of the utilities in a particular region.
Here are the US RTOs and ISOs: CAISO, ERCOT, SPP, MISO, PJM, NYISO, and ISO-NE.
All right, let’s get to it!
There’s still not much inter-regional (much less national) transmission planning
For most of the history of the US electricity system, up to the 1990s, almost all utilities were “vertically integrated,” meaning they owned the whole electricity value chain in a given territory, from generators to transmission and distribution. They built large central-station power plants close by to population centers and then ran transmission lines out to them. There was neither much need nor much appetite for building longer regional or inter-regional lines.
Over all that time, states developed a persistently parochial lens and tight control over transmission planning.
Two things have changed in recent decades.
One, renewable energy expanded rapidly and got really cheap, which is why solar and wind are the fastest growing sources of new electricity capacity. However, as we saw in the previous post, the most intense sun and wind in the US are distant from population centers. This sugg